South African CSP Project: Khi Solar One


Khi Solar One (50 MW) will be Abengoa´s third commercial solar tower and its first outside of Spain. The tower plant will be located on a 1482 acres site close to Upington, in the Northern Cape Province.


Project details

  • The plant, with 2 hours of thermal storage, will use a technologically advanced dry cooling system, which dramatically reduces water consumption by two-thirds.

  • The plant will also contain important technological advances in efficiency, using higher temperatures during the generation process, and having more than double the capacity of Abengoa’s previous towers. These advances come as a result of the latest generation of solar tower technology using superheated steam, which was developed by Abengoa in its R&D centers in Spain.

Project Overview

Project Name:

Khi Solar One

Country:

South Africa

Location:

Upington, Northern Cape

Owners & Developers:

Abengoa Solar & IDC

Technology:

Power tower

Turbine Capacity:

Net: 50.0 MW Gross: 50.0 MW

Status:

Operational

Lat/Long Location:

28°32 14.0 South, 21°4 39.0 East

Electricity Generation:

180,000 MWh/yr (Expected)

Break Ground:

Nov-12

Start Production:

5-Feb-16

PPA/Tariff Period:

20 years

Project Type:

Commercial

EPC Contractor:

Abener - Teyma

Operator(s):

Abengoa Solar

Generation Offtaker(s):

Eskom



Plant Configuration

Solar Field


Heliostat Solar-Field Aperture Area:

576,800 m²

# of Heliostats:

4,120

Heliostat Aperture Area:

140.0 m²

Heliostat Manufacturer:

Abengoa Solar

Tower Height:

200 m

Receiver Manufacturer:

CMI Solar

Heat-Transfer Fluid Type:

Water/Steam

Power Block


Turbine Capacity (Gross):

50.0 MW

Turbine Capacity (Net):

50.0 MW

Output Type:

Steam Rankine

Cooling Method:

Dry cooling

Thermal Storage


Storage Type:

Other

Storage Capacity:

2 hours

Thermal Storage Description:

Saturated steam




Environmental – social – economic benefits

  • Khi Solar One will prevent approximately 183,000 tons of CO2 emissions per year, and will supply clean energy to approximately 45,000 households.

  • The plant will create an average of 600 jobs during construction, and approximately 35 permanent, full-time jobs during plant operation.

  • It will contribute to South Africa´s goals of introducing up to 17,800 MW of renewable energy by 2030, and reducing its dependence on oil and natural gas.


Click to free download Factsheets of KaXu Solar One & Khi Solar One.


* Sourced by CSP Focus from Abengoa Solar & NREL & Online Updates 


Click here to register or download program for CSP Focus South Africa Nov.23-24 Johannesburg. 

 

CSP Focus

Tel: +86 21 5830 0710*8054

Email: csp@szwgroup.com 

Web: www.szwgroup.com/csp

LinkedIn: CSP Focus

Twitter: CSP Focus

Wechat public platform: cspfocus